TRANSPORTE POR DUCTOS
Balance por Gasoductos Prom. Anual /98 PCD
|
GASODUCTO
|
RECEPCION
|
ENTREGAS
|
CONSUMO PROPIO
|
STOCK
|
DIFERENCIA MEDICION
|
VENTEOS
|
| Carrasco - Colpa | 124,902,138 | (125,014,523) | 9.163 | 103.222 | ||
| Colpa - Río Grande | 130,268,247 | (130,053,983) | -34.043 | 115 | -66.436 | -113.900 |
| Colpa - Mineros | 3,414,732 | (3,414,732) | ||||
| Río Grande - Yacuiba | 172,882,584 | (173,200,590) | -153.633 | 79.962 | 402.873 | -11.197 |
| Bermejo- Ramos | 5,153,712 | (5,153,712 | ||||
| Río Grande - Santa Cruz | 37.173553 | (37,264,368) | 1.752 | 89.063 | ||
| Itaguzarenda - Charagua | 26.165 | -26.165 | ||||
| Villamontes - Tarija | 3,610,763 | (3,498,218) | -54.217 | -796 | -56.710 | -822 |
| Gasoducto al Altiplano | 35,794,774 | (35,216,298) | -336.747 | -53.013 | -168.746 | -19.970 |
| Taquiperanda - Potosí | 19,359,770 | (18,577,788) | -676.369 | 8.311 | -77.543 | -36.38 |
| Ceriillo - Moteagudo | 102.541 | -97.104 | -5.468 | 31 | ||
| Total | 532,688,979 | (531,517,481) | (1,260,477) | 45.525 | 225.723 | -182.269 |
Balance de Gas por Empresas y Sectores de Consumo Prom. Anual /98 PCD
|
EMPRESAS
|
INYECCION A GASODUCTOS
|
ENTREGAS
|
Total Entregas a Ductos
|
DIFERENCIA inyección - entregas
|
||||||
|
REFINERIAS
|
DIST. DE GAS
|
GEN. ELECTRICA
|
EXPORTACION
|
CON. PROPIO
|
CON. DIRECTO
|
OTROS (1)
|
||||
| ANDINA |
97,662,546
|
(1,589,261)
|
(26,407,450)
|
(31,438,273)
|
(33,964,154)
|
(3,196,576)
|
(382.204)
|
|
(96,977,918)
|
684.628
|
| CHACO |
79,133,786
|
|
(14,860,313)
|
(34,982,623)
|
(28,431,774)
|
|
(404.022)
|
|
(78,678,731)
|
455.055
|
| P.COMPANC + YPFB |
24,316,910
|
|
|
|
(24,055,629)
|
|
|
|
(24,055,629)
|
261.28
|
| PLUSPETROL (Bermejo) |
5,153,712
|
|
|
|
(5,153,712)
|
|
|
|
(5,153,712)
|
|
| SOPETROL |
112.513
|
|
|
|
(110.826)
|
|
|
|
(110.826)
|
1.688
|
| TESORO |
35,298,019
|
|
|
|
(35,035,834)
|
|
|
|
(35,035,834)
|
262.185
|
| VINTAGE |
27,778,304
|
|
|
|
(27,575,328)
|
|
|
|
(27,575,328)
|
202.976
|
| YPFB |
|
|
|
|
|
-67.388
|
|
|
(67.388)
|
(67.388)
|
| TRANSREDES |
|
|
|
|
|
(1,889,403)
|
|
88.979
|
(1,800,424)
|
(1.800.424)
|
| Sub Total |
269,455,789
|
(1.589.261)
|
(41.267.762)
|
(66.420.896)
|
(154.327.257)
|
(5.153.367)
|
(786.225)
|
88.979
|
(296,455,790)
|
0
|
| PLUSPETROL | 816.963 | (532.538) | (248.579) |
(818.963)
|
||||||
| Sub Total | 816.963 | (532.538) | (248.579) |
(818.963)
|
||||||
|
(1.589.261)
|
(41.800.147)
|
(66.705.474)
|
(154.327.256)
|
(5.153.367)
|
(786.225)
|
88.979
|
(270.272.753)
|
|||
Balance del Movimiento de Hidrocarburos Líquidos por Oleoductos de Transredes Prom. Anual /98
|
DUCTO
|
SIGLA
|
INVENTARIO INICIAL
|
RECEPCIONES
|
ENTREGAS
|
INVENTARIO FINAL
|
BALANCE
|
|||
|
Est./Tk
|
En Línea
|
Est./Tk
|
En Línea
|
Merma (-)
|
Demasía (+)
|
||||
|
BPD
|
BPD
|
BPD
|
BPD
|
BPD
|
BPD
|
||||
| Propanoducto Río Grande - Santa Cruz | PRSZ |
391
|
83
|
4.603
|
4.522
|
356
|
83
|
-116
|
-2.52% |
| Oleoducto Cochabamba - Arica | OSSA - 2 |
0
|
6.423
|
7.106
|
7.094
|
0
|
6.458
|
22
|
0.32% |
| Oleoducto Santa Cruz - Cochabamba | OSSA - 1 |
24
|
5.478
|
27.289
|
26.658
|
23
|
5.478
|
-632
|
-2.32% |
| Oleoducto Surubí - Carrasco | OSCRR |
0
|
101
|
12.638
|
12.638
|
0
|
101
|
0
|
0.00% |
| Oleoducto Río Grande - Santa Cruz | ORSZ |
0
|
396
|
4.384
|
4.199
|
0
|
396
|
-185
|
-4.21% |
| Oleoducto Palmasola - Estación #1 | OPE |
0
|
40
|
5.318
|
5.307
|
0
|
40
|
-11
|
-0.20% |
| Oleoducto Carrasco - Caranda | ONSZ - 2 |
885
|
1.271
|
20.296
|
20.428
|
899
|
1.271
|
146
|
0.72% |
| Oleoducto Carrasco - Víbora - Caranda | ONSZ - 1 |
247
|
560
|
6.921
|
6.917
|
235
|
560
|
-16
|
-0.23% |
| Oleoducto Estación #1 - Palmasola | OEP |
2.205
|
56
|
35.820
|
35.71
|
2.287
|
63
|
-22
|
-0.06% |
| Oleoducto Camiri - Yacuiba | OCY |
2.181
|
2.038
|
7.507
|
7.513
|
2.085
|
2.028
|
-100
|
-1.33% |
| Oleoducto Chorety - Santa Cruz | OCSZ - 2 |
0
|
2.49
|
4.896
|
4.783
|
0
|
2.48
|
-124
|
-2.52% |
| Oleoducto Caranda - Santa Cruz | OCSC |
229
|
687
|
27.756
|
27.776
|
225
|
687
|
16
|
0.06% |
| Oleoducto Carrillos - Chorety | OCCH |
339
|
184
|
627
|
590
|
374
|
184
|
-1
|
-0.14% |
| Estación Arica | Arica |
1.738
|
0
|
0
|
0
|
1.729
|
0
|
-8
|
|
| Agua | Agua |
0
|
0
|
0
|
180
|
0
|
0
|
180
|
|
|
TOTAL
|
8.238
|
19.807
|
165.317
|
164.317
|
8.213
|
19.827
|
-849
|
-0.51% | |
Volúmenes Transportados y Capacidades de Transporte de Poliductos YPFB Promedio Anual /98
|
DUCTO
|
PRODUCTOS
|
VOLUMEN TRANSPORTADO
|
CAPACIDAD
|
|||||
|
NOMINAL
|
UTILIZADA
|
DISPONIBLE
|
||||||
|
BPD
|
%
|
BPD
|
BPD
|
%
|
BPD
|
%
|
||
| OCOLP POLIDUCTO COCHABAMBA - LA PAZ | ||||||||
| GAS ESPECIAL |
4.570.6
|
44.0%
|
||||||
| GLP |
2.957.0
|
28.5%
|
||||||
| DIESEL OIL |
1,751.0
|
16.9%
|
||||||
| JET FUEL |
607.8
|
5.9%
|
||||||
| KEROSENE |
473.3
|
4.6%
|
||||||
| GAS PREMIUM |
17.4
|
0.2%
|
||||||
| FUEL OIL |
0.0
|
0.0%
|
||||||
| TOTAL |
10.377.2
|
100.0%
|
12.000.0
|
10.377.2
|
86.5%
|
1.622.8
|
13.5%
|
|
| PCPV POLIDUCTO COCHABAMBA - PTO. VILLARROEL | ||||||||
| DIESEL OIL |
825.9
|
62.6%
|
||||||
| GAS ESPECIAL |
316.7
|
24.0%
|
||||||
| JET FUEL |
120.4
|
9.1%
|
||||||
| KEROSENE |
47.6
|
3.6%
|
||||||
| GLP |
9.6
|
0.7%
|
||||||
| TOTAL |
1.320.2
|
100.0%
|
2.000.0
|
1.320.2
|
66.0%
|
679.8
|
34.0%
|
|
| OCS POLIDUCTO CAMIRI - SUCRE | ||||||||
| C. RECONST. "A" |
1.666.0
|
59.6%
|
||||||
| GLP |
822.9
|
29.4%
|
||||||
| PLATFORMADO |
137.5%
|
4.9%
|
||||||
| DIESEL OIL |
80.7
|
2.9%
|
||||||
| GAS LIVIANO |
51.4
|
1.8%
|
||||||
| GAS ESPECIAL |
36.1
|
1.3%
|
||||||
| TOTAL |
2.794.6
|
100.0%
|
5.000.0
|
2.794.6
|
55.9%
|
2.205.4
|
44.1%
|
|
| OSP POLIDUCTO SUCRE - POTOSI | ||||||||
| DIESEL OIL |
789.7
|
42.3%
|
||||||
| GAS ESPECIAL |
534.3
|
28.6%
|
||||||
| GLP |
426.6
|
22.8%
|
||||||
| KEROSENE |
118.0
|
6.3%
|
||||||
| TOTAL |
1.868.7
|
100.0%
|
3.000.0
|
1.868.7
|
62.3%
|
1.131.3
|
37.7%
|
|
| PVT POLIDUCTO VILLAMONTES - TARIJA | ||||||||
| GAS ESPECIAL |
348.9
|
41.4%
|
||||||
| GLP |
311.0
|
36.9%
|
||||||
| DIESEL OIL |
182.6
|
21.7%
|
||||||
| TOTAL |
842.4
|
100.0%
|
1.500.0
|
842.4
|
56.2%
|
657.6
|
43.8%
|
|
| OCSZ-1 POLIDUCTO SANTA CRUZ CAMIRI | ||||||||
| DIESEL OIL |
921.1
|
52.4%
|
||||||
| GAS ESPECIAL |
579.8
|
33.0%
|
||||||
| PLATFORMADO |
131.5
|
7.5%
|
||||||
| GAS LIVIANO |
72.2
|
4.1%
|
||||||
| P. CRUDO |
54.4
|
3.1%
|
||||||
| TOTAL |
1.759.0
|
100.0%
|
4.000.0 | 1.759.0 | 44.0% | 2.241.0 | 56.0% | |
| OPVV POLIDUCTO PALMASOLA - VIRU VIRU | ||||||||
| JET FUEL |
1.993.7
|
100%
|
||||||
| TOTAL |
1.993.7
|
100%
|
2.500.0
|
1.993.7
|
79.7%
|
506.3
|
20.3%
|
|
Oleoductos Transredes( No considera ramales ni paralelas)
|
OLEODUCTO
|
DIAMETRO (PULGADAS)
|
LONGITUD (KILOMETROS)
|
| OSSA Santa Cruz - Campero |
12-10-6
|
761.0
|
| ONSZ 1 Carrasco - Caranda |
4-6
|
193.2
|
| OCSC Caranda - Santa Cruz |
10-8
|
60.1
|
| ONSZ II Carrasco - Caranda |
10
|
126.0
|
| ORSZ Río Grande - Santa Cruz |
8
|
54.2
|
| OEP Santa Cruz - Ref. Elder |
4-6
|
10.7
|
| OPE Ref. Elder - Santa Cruz |
6
|
10.2
|
| PRSZ Río Grande - Ref. Elder |
4
|
48.0
|
| OCSZ II Chorety - Santa Cruz |
8-10
|
267.8
|
| OCY I Pocitos - Chorety |
6
|
258.5
|
| OCY II Chorety - Villa Montes |
6
|
162.5
|
| OCCH Cerillos - Chorety |
6-5-4
|
59.6
|
| OCCCH Campo Camiri - Chorety |
2
|
12.0
|
Gasoductos Troncales de Transredes (No considera ramales ni paralelas)
|
GASODUCTO
|
DIAMETRO (PULGADAS)
|
LONGITUD (KILOMETROS)
|
| GAA Río Grande - La Paz |
10-6
|
780.4
|
| GTC Taquiperenda - Cochabamaba |
10-8-6
|
580.7
|
| GTS Tarabuco - Sucre |
6
|
44.162
|
| GSP Sucre - Potosí |
6-4
|
100.4
|
| GSCY Colpa - Yacuiba |
24
|
529.5
|
| GCY Carrasco - Yapacani |
12
|
76.4
|
| GYC Yapacaní - Colpa |
16
|
114.3
|
| GRCSZ Río Grande - Santa Cruz |
12-10
|
46.3
|
| GVT Villamontes - Est. Comp. |
4
|
176.0
|
| Bermejo - Ramos |
12
|
3.5
|
| Caranda - Colpa |
10
|
32.7
|
| Colpa - Miranda |
6-4
|
63.9
|
| Longitud Total |
2.548.7
|
Poliductos YPFB ( No considera ramales ni paralelas)
|
POLIDUCTO
|
DIAMETRO (PULGADAS)
|
LONGITUD (KILOMETROS)
|
| Ref. G. Villarroel - El Alto |
6
|
371.5
|
| PCPV Ref. G. Villarroel - Cochabamba |
3
|
224.8
|
| OCSZ I Ref. G. Elder - Chorety |
4
|
270.0
|
| OCS Camiri - Sucre |
6-4
|
307.7
|
| OSP Sucre - Potosí |
3
|
113.9
|
| PTV Villa Montes - Tarija |
4
|
176.0
|
| OPVV Ref. G. Elder |
31
|
32.9
|
| Poliducto Ref. Villarroel - Aerop. Wilsterman |
23
|
7.2
|
| Poliducto Term. El Alto - Aerop. El Alto |
Sin datos
|
Sin datos
|
Características del Gasoducto Bolivia - Brasil
| Cabecera | Planta compresión de Río Grande |
| Terminal en el tramo boliviano | Estación de medición del Mutún |
| Longitud | 556.7 Km |
| Diámetro de la línea troncal | 32 pulgadas |
| Capacidad | 30 MMMCD |
| Especificación de cañería | API 5L X-70 |
| Espesores de cañería | 0.460 - 0.650 pulgadas |
| Presión normal de operación | 1420 psi |
| Presión máxima de operación | 1429 psi |
| Planta de compresión inicial | Río Grande Km 0+000 |
|
Estaciones de compresión
|
Izozog Km 125 |
| Chiquitos Km 242 | |
| Roboré Km 364 | |
| Yacuses Km 486 (1) | |
| Nro. compresores por estación | 4 |
| Estaciones de medición | Río Grande Km 0+000 |
| Mutún Km. 556.7 | |
| Elemento de medida de gas | Placa de orificio |
| Válvulas de línea troncal de 32 pulgadas | 24 (2) |
| Especificaciones del gas a ser exportado | Poder calorífico 9200kcal/m3 |
| 1034 BTU/MCF mínimo | |
| Gravedad específica 0.56 a 0.59 | |
| Agua: 95 mg/m3; 6 lb/MMPC máxima | |
| Punto de rocío: 7.2oC;45oF máximo | |
| Sistema supervisor de operaciones | SCADA (Control supervisión y adquisición de datos) |
| Centro de control y supervisión | Santa cruz - CSC |
| Unidades terminales remotas | Río Grande, Chiquitos, Mutún, Yacuses y estaciones locales de control y supervisión. |
| Revestimiento exterior cañeria | Polietileno extruido tricapa (PE Three Layer) |
| Revestimiento interior cañeria | Pintura Epoxi (Epoxi Liquid paint) |
| Ssitema de protección catódica | Corriente impresa |
Nuevos Ductos y Ampliaciones
|
DUCTO
|
DESCRIPCION
|
PROPIETARIO
|
DIAMETRO (PULGADAS)
|
LONGITUD (KM)
|
CAP.
|
INVERSION (MM$US)
|
ESTACIONES DE BOMBEO
|
ESTACIONES COMPRESION
|
ESTADO
|
| Gasoducto San Miguel - Cuiaba | Nace en el Km. 242 (San Miguel) del gasoducto de exportación Río Grande - Pto. Suárez - Sao Paulo, atraviesa territorio boliviano hasta la localidad de San Matías cruzando la frontera y dirigiendose hasta Cuiabá (Matto Grosso- Brasil) |
Gas Oriente Boliviano
|
18"
|
359 Km en el lado boliviano 267 Km. en el lado Brasilero | 91..11 MMPCD | 123.67 MMUS$ en el tramo boliviano | Tramite de Concesión sujeto a promulgación de Ley expresa de los corredores de exportación | ||
| Gasoducto Naranjillos - Rio Grande | Nace en el campo Naranjillos ubicado en el departamento de Santa Cruz y llega hasta la planta de compresión de Río Grande |
Vintage Petroleum Boliviana Ltda.
|
10"
|
48 Km. | 60 MMPCD | 10.22 MMUS$ | Proyecto en 1ra fase de concesión | ||
| Ampliación Gasoducto Bolivia - Brasil | La ubicación de las dos líneas paralelas (loops) está comprendida en el tramo Río Grande - San Miguel (KP 242). La primera paralela se inicia en el KP 0+000 y concluye en el KP 25+000. la segunda paralela se inicia KP 125+000 y concluye en el KP 142+000 |
Gas Trans Boliviano
|
36"
|
25 Km. la primera paralela 17 Km. la segunda paralela | 81.2 MMPCD | 45.04 MMUS$ | Concesión en Trámite | ||
| Ampliación del Gasoducto al Altiplano (GAA) | La ampliación consiste en la construcción de una línea paralela que sale de la estación de Parotani (Coochabamba) hasta la altura del pueblo de Pongo a 41 Km de Parotoni |
Transredes S.A.
|
8"
|
41 Km. | 6.1 MMUS$ | Concesión en Trámite | |||
| Poliducto La Paz -Ilo | Nace en la planta de Senkata de La Paz (Y.PF.B.)y atraviesa territorio boliviano en dirección oeste hacia el Perú. Border el perfil sur del lago Titicaca y cruza la frontera atravesando la cordillera hasta bajar al Puerto de Ilo al Perú |
Wibros Transandina S.A.
|
12"
|
113 Km. en el lado boliviano 300Km. en el lado peruano. | 50.000 BPD | 59.6 MMUS$ en el tramo boliviano | Proyecto en 1ra fase de concesión | ||
| Oleoducto Carrasco - Cochabamba | Nace en el campo Carrasco ubicado en el departamento de Cochabamba llaga hasta la terminal o estación de recepción de la refinería de Valle Hermoso. este oleoducto será adecuado también para el transporte de GLP |
Transredes S.A
|
6", 8" Y 10"
|
247 Km. | 20.000 BPD | 44 MMUS$ aproximadamente con la adecuación para GLP | Cabecera y dos intermedias | Conclusión prevista para octubre de 1999 | |
| Ampliación oleoductos OSSA 1 y OSSA 2 | El proyecto consisteen la renovación de las bombas existentes, la adición de nuevas unidades y mejores en las líneas para permitir una capacidad de transporte de 50.000 BPD al OSSA1 y de 30.000 BPD al OSSA2 |
Transredes S.A
|
50.000 BPD en OSSA1 con la mejora. 30.000 BPD en OSSA2 con la mejora | 7.8 MMUS$ en OSSA1 10MMUS$ en OSSA 2 | Concesión en Trámite | ||||
| Ampliación poliducto Cochabamba - La Paz (Senkata) OCOLP | Nace en la refinería de Valle hermoso en Cochabamba y llega hasta la planta de Senkata en la Ciudad de El Alto (La Paz). La Amplliación consiste en la construcción de una paralela a lo largo del actual poliducto y la adecuaciónde 37 Km. del mismo. |
YPFB
|
6"
|
327 Km. | 18.000 BPD con la ampliación | 8.41 MMUS$ | Construccióna al finalizar septiembre de 1999 |